Salient Features
Installed Capacity
600 MW (4×150 MW)
Location
| State/Country | Bhutan |
| District | Trashiyangtse |
| River | Khorlochhu |
| Nearest Village(Dam Site) | Buyang |
| Nearest Village(Power House Site) | Duksum |
| Access | |
| Airport | Paro(Bhutan), Guwahati(Assam, India) |
| Rail Head | Rangia(Assam, India) |
| Geographical Co-ordinates Dam Site | |
| Latitude(N) | 27o 32′ 50″ |
| Longitude(E) | 91o 30′ 49″ |
| Geographical Co-ordinates Power House | |
| Latitude(N) | 27o 24′ 23″ |
| Longitude(E) | 91o 32′ 57″ |
Meteorology
| Atmospheric Temperature | |
| Maximum Temperature | 26o C |
| Minimum Temperature | 4o C |
Hydrology
| Catchment Area at Diversion Site | 1044 Km2 |
| Snow Catchment(Out of Total) | 15 Km2 |
| Maximum Observed Discharge at Dam Site | 929 cumec |
| Minimum Observed Discharge at Dam Site | 10.3 cumec |
| Probable Maximum Flood(PMF) | 8750 cumec |
| Average Annual Yield | 1621 MCM |
Reservoir
| Full Reservoir Level(FRL) | EL 1572.00 M |
| Minimum Draw Down Level (MDDL) | EL 1558.00 M |
| Water Spread at FRL | 12.68 Ha |
| Gross Storage at FRL | 2.9 MCM |
| Dead Storage at FRL | 1.52 MCM |
| Live Storage | 1.38 MCM |
| Length of Reservoir | 1.4 Km |
Dam
| Full Reservoir Level(FRL) | EL 1572.00 m |
| Minimum Draw Down Level (MDDL) | EL 1558.00 m |
| Type of Dam | Concrete Gravity Dam |
| Top Elevation of Dam | EL 1574.00 m |
| River Bed level at Dam Site | EL 1512.00 m |
| Dam Height above River bed | 62 M |
| Deepest Foundation Level | EL 1479.65 m |
| Maximum Height above Foundation Level | 95 m |
| Length of Dam at Top | 165 m |
| Top Width of Dam | 6 m |
| Length of Overflow Blocks | 69 m |
| Length of Non-Overflow Blocks | 96 m |
Spillway
| Design Flood | 8750 cumec(PMF) |
| Energy Dissipation System | Trajectory Bucket with naturally formed Plunge Pool |
| Lower Tier | |
| Type | Ogee with Sluice type |
| No. of Bays | 5 Bays |
| Size of Gate | 7.8 (W) x 12.5 (H) |
| Crest Level | EL 1525.00 m |
| Upper Tier | |
| Type | Ogee with Open Crest |
| No. of Bays | 1 Bay |
| Size of Gate | 7.8 (W) x 4.3 (H) |
| Crest Level | EL 1568.00 m |
Power Intake
| Type | Straight Type with Incline Trash Rack |
| Number/s | 2 Nos. |
| Design Discharge(All units running at full load including 20% of Flushing Discharge) | 56.4 cumec each |
| Invert Level | EL 1546.65 m |
| Level at Centre of Tunnel | EL 1549.00 m |
| Top Level | EL 1574.00 m |
| Intake Feeder Tunnel | |
| No. of Tunnel/s | 2 Nos. |
| Size of Tunnel | 4.7 m Diameter |
| Shape of Tunnel | Horse Shoe Shape |
| Length | 198 m & 233 m |
Silt Flushing Tunnel
| Main Tunnel | |
| Size of Tunnel | 2.5 (W) x 3.5 (H) |
| Shape of Tunnel | D Shape |
| Length of Tunnel | 97 m |
| Branch Tunnel | |
| Size of Tunnel | 1.5 (W) x 2.2 (H) |
| Shape of Tunnel | D Shape |
| Length of Tunnel | 125, 200 m |
Desilting Chamber
| Number/s | 2 Nos. |
| Size | 13 (W) x 17.5 (H) |
| Length | 350 m |
| Average Design Discharge (with 10% Overload) | 53.85 cumec each |
| Maximum Particle Size to be Removed | 0.2 mm and above |
Head Race Tunnel
| Design Discharge | 89 cumec |
| Size of Tunnel | 5.7 Diameter |
| Shape of Tunnel | Horse Shoe Shape |
| Length of Tunnel | 15.77 km |
| Adits | 6 Nos. 6.8 Diameter, D Shape |
Chaplangchhu Diversion
| Location of Diversion Tunnel | Left Bank |
| No. of Tunnel/s | 1 No. |
| Size of Tunnel | 10 m Diameter |
| Shape of Tunnel | Horse Shoe Shape |
| FSL | EL 1576.00 m |
| Design Discharge | 5 cumec |
| Trench Weir | 10 (L) x 2.5 (W) x 3 (H) |
| Intake Invert Level | EL 1575.30 m |
| Feeder Tunnel | 2 (W) x 2.5 (H), 110 m Long |
| Desilting Chamber | 5 (W) x 7 (H), 110 m Long |
| Inlet Tunnel to Drop Shaft | 2.1 (W) x 2.1 (H), 220 m Long |
| Drop Shaft | 2.5 m Diameter, 75 m deep, Open to Sky |
| Connecting Tunnel-Drop Shaft to HRT | 1.8 (W) x 2.1 (H), 485 m Long |
Diversion Tunnel
| Location of Diversion Tunnel | Left Bank |
| No. of Tunnel/s | 1 No. |
| Size of Tunnel | 10 m Diameter |
| Shape of Tunnel | Horse Shoe Shape |
| Length of Tunnel | 372 m |
| Diversion Discharge (25 years) | 1112 cumec |
| Inlet Invert Level | EL 1521.00 m |
| Outlet Invert Level | EL 1508.00 m |
| Diversion Tunnel Gate | 10 m (W) x 10 m (H) |
Surge Shaft
| Number/s | 1 No. |
| Type | Restricted Orifice Type |
| Size and Shape | 9.5 m Diameter, circular |
| Height | 152.8 m |
| Top Level | EL 1640.00 m |
| Gates | 2.75 (W) x 5.22 (H), 2 Nos. |
Valve House
| Number/s | 2 Nos. |
| Type | Butterfly Valve |
| Size of Valve | 3.3 m Diameter |
Pressure Shaft
| Main Pressure Shaft | |
| Number/s | 2 Nos. |
| Type | Circular |
| Size | 3.3 m Diameter |
| Length | 1200.57 m Long each |
| Branch Pressure Shaft | |
| Number/s | 4 Nos. |
| Type | Circular |
| Size | 2.35 m Diameter |
| Length | 187 m Long |
Power House Complex
| Type | Undergoround Power House |
| Location | Right Bank of Drangmechu (Gongrichu) |
| No. of Cavern/s | 2 Nos. |
Power House-Machine Hall
| Size | 123 (L) x 21 (W) x 42.5 (H) m |
| Type of Turbine | Pelton Wheel |
| Number/s | 4 Nos. |
| Capacity | 150 MW each |
| Distributor Centre Line Level | EL 772.50 m |
| Turbine Floor Level | EL 775.00 m |
| Generator Floor Level | EL 779.50 m |
| Service Bay Floor Level | EL 784.00 m |
| Maximum Tail Water Level | EL 768.00 m |
| Design Head | 761.53 m (net) |
Transformer Hall, GIS cum TRT Gate Operation Cavern
| Facilities | Transformer Hall, GIS, TRT Gate Operation |
| Size | 130 (L) x 16 (W) x 24 (H) m |
| Transformer Hall Floor Level | EL 784.00 m |
Access Tunnels (PH Complex)
| Main Access Tunnel (MAT) | |
| Size, Shape & Length | 8 m Diameter, D Shape, 255.20 m Long |
| Cable Access Tunnel (CAT) | |
| Size, Shape & Length | 6.5 m Diameter, D Shape, 251 m Long |
| Ventilation Tunnel | |
| Size, Shape & Length | 6.5 m Diameter, D Shape, 87.99 m Long |
| Drainage Gallery | |
| Size, Shape & Length | 2.5 m Diameter, D Shape, 219.54 m Long |
| Access Tunnel | |
| Size, Shape & Length | 7 m Diameter, D Shape, 50 m Long |
| Escape Tunnel | |
| Size, Shape & Length | 3 m Diameter, D Shape, 50 m Long |
Tail Race Tunnel
| Unit TRT | |
| Number/s | 4 Nos. |
| Type | D Shape |
| Size | 3 (W) x 6 (H) m |
| Length | 605.19 m Long |
| Main TRT | |
| Number/s | 1 No. |
| Type | D Shape |
| Size | 6 (W) x 6 (H) m |
| Lenght | 1521.73 m Long |
Power Generation
| Design Energy in 90% Dependable year with 95% Plant availability | 2568.88 MU |
| Annual Load Factor | 49.45% |
| Construction Period | 59 Months from Jan2025 |
| Total Project Estimated Cost | Nu. 6899 Crores |